By using this site, you agree to the Privacy Policy and Terms of Use.
Accept

Amed Post

Breaking News,magazine, sport, life

Notification Show More
Font ResizerAa
Reading: Fate of California’s last nuclear power plant revealed as millions of residents’ energy needs hang in balance
Share
Font ResizerAa

Amed Post

Breaking News,magazine, sport, life

Search
Have an existing account? Sign In
Follow US

Fate of California’s last nuclear power plant revealed as millions of residents’ energy needs hang in balance

amedpost
Last updated: April 3, 2026 8:24 pm
amedpost
Published: April 3, 2026
Share
SHARE



Regulators approved a multi-decade extension of operations at California’s last remaining nuclear power plant after it was set to close by 2030 under pressure from environmentalists.

On Thursday, the U.S. Nuclear Regulatory Commission approved an application for the Diablo Canyon Power Plant in San Luis Obispo Bay to operate until 2045.

Regulators approved a multi-decade extension of operations at California’s last remaining nuclear power plant after it was set to close by 2030 under pressure from environmentalists.
On Thursday, the U.S. Nuclear Regulatory Commission approved an application for the Diablo Canyon Power Plant in San Luis Obispo Bay to operate until 2045.

The plant, which is a source of green energy, provides about 8.5% of California’s power.


Download The California Post App, follow us on social, and subscribe to our newsletters

California Post News: Facebook, Instagram, TikTok, X, YouTube, WhatsApp, LinkedIn
California Post Sports Facebook, Instagram, TikTok, YouTube, X
California Post Opinion
California Post Newsletters: Sign up here!
California Post App: Download here!
Home delivery: Sign up here!
Page Six Hollywood: Sign up here!


A decade ago, operator PG&E announced that the facility would shutter in 2024 before a California Senate bill passed in 2022 moved the deadline to 2030.

The extension ensures that the location will continue to provide clean electricity to around 4 million Californians.

It also makes up nearly 20% of the state’s clean energy and 10% of the state’s total electricity, according to Gov. Gavin Newsom’s office.

Any closure of the plant likely would’ve strained the state’s energy supplies even further and in turn raised the cost of energy. California residents already pay some of the highest utility and gas costs in the nation.

Any closure of the plant likely would’ve strained the state’s energy supplies even further and in turn raised the cost of energy.
It also makes up nearly 20% of the state’s clean energy and 10% of the state’s total electricity, according to Gov. Gavin Newsom’s office. Getty Images

Newsom, who realized the plant was needed to avoid devastating blackouts in the state, celebrated the extension of the plant’s operations.

“When the Legislature and I partnered to extend Diablo Canyon’s operation past 2025, we made a commitment to Californians that tackling extreme weather and supporting a reliable grid are essential to building a safe, affordable, and resilient future for our state,” he said in a release on Thursday.

The California state legislature still needs to approve the 2045 extension.



Jonathan Drouin, now with Blues, says he enjoyed time with Islanders
Starmer’s migrant crisis 1-for-1 deal with France comes into force | Politics | News
‘ShamWow Guy’ Vince Offer Shlomi reveals what is motivating him to run for Congress
49ers fraudster allegedly dragged Jordan Love and Tyreek Hill into $1.3 million scam
I want to love the Galaxy S25 Edge but Samsung failed to deliver one vital thing

Subscribe

Subscribe to our newsletter to get our newest articles instantly!

[mc4wp_form]

Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

© AMED POST Design Company. All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?