By using this site, you agree to the Privacy Policy and Terms of Use.
Accept

Amed Post

Breaking News,magazine, sport, life

Notification Show More
Font ResizerAa
Reading: Africa’s £15bn mining mega project set to reach world’s largest untapped metal deposit | World | News
Share
Font ResizerAa

Amed Post

Breaking News,magazine, sport, life

Search
Have an existing account? Sign In
Follow US

Africa’s £15bn mining mega project set to reach world’s largest untapped metal deposit | World | News

amedpost
Last updated: March 29, 2025 5:00 am
amedpost
Published: March 29, 2025
Share
SHARE


A massive £15 billion mining project in Guinea is set to tap into what is believed to be the world’s largest untapped iron ore deposit. The  Simandou site, located in the south of the country, contains an estimated 2.8 billion tonnes of high-grade iron ore.

The project has been delayed for several years due to political upheaval, disputes over licences and problems with infrastructure, but it’s all reportedly about to change. Guinea’s ruling junta said that production is expected to begin later this year. Mining already accounts for around 90% of Guinea’s exports and officials say this project could transform the country’s future. “This mining project must be for Guinea what oil was for the Gulf,” said Ismaël Nabé, the country’s minister for planning, in comments reported by The Guardian.

The scale of the development is enormous. Plans include a 403 miles railway linking the mine to the Atlantic coast, three deep-sea ports, a metallurgical plant and thousands of miles of road by 2040. 

Authorities also claim the investment will create around 60,000 jobs and provide better access to education in one of the world’s poorest nations.

On social media and in official videos, the government has branded the project Simandou 2040 – describing it as a “bridge to prosperity.”

The Guardian reports that some industry experts have even called it a “Pilbara killer,” referring to the idea that it could one day rival Australia’s largest iron-producing region.

But questions are being raised about the timeline. Although some infrastructure is already underway, large sections of the railway remain incomplete and several construction areas are still far from ready. 

According to The Guardian, some analysts don’t expect real production to begin before 2028.

The project’s ownership has also become more complicated since Guinea’s 2021 military coup. 

Two of the four mining blocks are owned by a consortium including Rio Tinto, a Chinese holding company and the Guinean government. The other two are being developed by a Singapore-based group.

Critics have also raised concerns over transparency. “There is no transparency in the Simandou project,” said journalist Mamoudou Diallo, who has been investigating the project.. 

He told The Guardian that only a few members of the ruling junta have access to key information about how the deal is financed.

The Extractive Industries Transparency Initiative (EITI), which Guinea joined in 2007, has also urged the government to publish contracts related to the project.

What’s more, villagers in areas close to the mine say construction work is damaging the environment. 

Some claim solid waste is polluting water supplies and damaging rice fields. “Citizens are even complaining that evacuation canals have been drained towards fields, in particular rice fields and water sources,” said Diallo.

Bright Simons, from the Imani Centre for Policy and Education, told The Guardian that the project’s timeline appears politically motivated, with junta leader Mamady Doumbouya expected to run in Guinea’s next election.

5 killed after freight train hits van in rural Mississippi
Chaos in Tenerife as 200,000 tourists across Canary Islands refuse to pay fines | World | News
Massive 40-foot whale carcass washes up on NYC beach
OnePlus beats Samsung to launch with two high-end Android smartphones
Rashan Gary being traded to Cowboys after Instagram message confusion

Subscribe

Subscribe to our newsletter to get our newest articles instantly!

[mc4wp_form]

Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

© AMED POST Design Company. All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?